Core Haus New Build


Contact person: Mr. Craig Peterson
Correspondence: English
Yearly Turnover: 2,000,000 GBP
Foundation: 29.10.2014
Operation Level: National

Address: (Carlton House), 15 Parsons Court, Welbury Way
DL5 6ZE Newton Aycliffe , Co. Durham Great Britain
Phone: +44 1 02 55 25
Web: http://www.corehaus.co.uk


CoreHaus uses modern methods of construction, intelligently. Our manufacturing principles are based on a standardised 'modular' core which houses a pre-finished WC, bathroom, staircase and heating system. As a result, 80% of commonly-problematic construction processes are taken care of offsite and there is an up to 50% reduction in the onsite construction programme.

A specially-chosen selection of panelised external walling systems ensure that CoreHaus can be used in both urban and rural locations with elevation treatments tailored to suit each setting. The standardised modular core has been designed to allow CoreHaus to be configured so that it provides 2, 3, 4 and 5 bedroom solutions.

Standardisation sits at the core of our cost reduction strategy, but not at the expense of functionality and good design. Committed to delivering value for money, we work closely with local supply chains to introduce competition and provide national coverage. A standard design and faster build programme will help CoreHaus achieve savings on site prelims and professional fees.

Design and manufacture of low carbon modular housing.

HOMES EVENT
National exhibition of repairing and maintenance, retrofitting and sustainability in housing
22/11/2023 - 23/11/2023
Location Olympia Exhibition Centre
London
Great Britain